# Marina Construction Contracting licence in the UAE

> The Dubai mainland lists it. It needs approval from Dubai Municipality and the Department of Economy and Tourism (Dubai), or the emirate's own municipality and economic department.. The approval sets the timeline and cost, so the setup team prices it.

- Canonical: https://dubaisetupindex.com/activities/marina-construction-contracting
- Updated: 2026-09-05
- Dubai mainland (DET): 4290905
- Regulation: Regulator approval required
- Routes we handle: 1 of 4 list it
- Outside approval: Dubai Municipality and the Department of Economy and Tourism (Dubai), or the emirate's own municipality and economic department.
- Licence type: Commercial
- Mainland licence alone: AED 14,000 (Licence only · plus 5% of rent)
- Publication: below the publication gate (No decision value beyond the activity name)
- Method: https://dubaisetupindex.com/methodology

## Routes that list this activity

- [Dubai mainland (DET)](https://dubaisetupindex.com/mainland) — Onshore trading rights, Ejari premises, available with Dubai Setup Index. From, no visa: AED 14,000 (Licence only · plus 5% of rent)

A route listing the activity is a starting point. The authority confirms eligibility when you apply.

- [Start with Dubai mainland (DET)](https://dubaisetupindex.com/apply/new?zone=dubai&activity=marina-construction-contracting)

## Cheapest evidenced route and first-year cost

None of the free-zone catalogues we track lists this activity, so no zone price can be tied to it.

A package price is not a full setup total, and what it includes varies by zone: check the zone page before you budget. This activity needs an outside approval, and approval costs are not in these prices. A catalogue listing is what the authority publishes, not an eligibility decision.

- [Get a quote](https://dubaisetupindex.com/apply/new?zone=dubai&activity=marina-construction-contracting&visas=1)
- [Estimate my first-year cost](https://dubaisetupindex.com/estimate?activity=marina-construction-contracting&visas=1)

The quote opens on the Dubai mainland with one visa. The estimate opens without a route, since none that lists this activity has a line-by-line estimate. The setup team replies with a written quotation, and nothing is sent until you approve it.

## Year 2: renewal

The first-year starting price beside what the licence costs to renew the year after, with no visa.

| Route | Year 1, from | Year 2 renewal |
| :--- | :--- | :--- |
| [Dubai mainland](https://dubaisetupindex.com/mainland) | AED 14,000 (Licence only · plus 5% of rent) | Not published |

## Where you can licence this

| Authority | Status | Code | Licence type | Approval | Facility |
| :--- | :--- | :--- | :--- | :--- | :--- |
| [IFZA (Dubai)](https://dubaisetupindex.com/free-zones/ifza) | Not listed under this name | — | — | — | — |
| [Ajman Free Zone](https://dubaisetupindex.com/free-zones/ajman) | Not listed under this name | — | — | — | — |
| [Dubai mainland (DET)](https://dubaisetupindex.com/mainland) | Listed | 4290905 | Commercial | Not stated | Not stated |

## Free zone or mainland

- Dubai mainland under DET licenses onshore operation, but it expects Ejari-registered premises and runs longer than a free-zone desk package. A free-zone company reaches mainland clients through a distributor, DET's free-zone operating permit or branch, or a mainland licence; the activity and where the work is performed decide which.

## What the authority says

Includes the installation and maintenance of floating docks, pontoons, jetties along with associated mooring systems comprising of piles, chain, elastic ropes and ancillary works like sewage pump out, water and electricity supply, firefighting systems for recreational, private and government facilities, the works include installation and maintenance of navigational buoys and signs and safety measures

Source: Invest in Dubai activity reference.

## Related activities

- [Ports & Marine Construction Contracting](https://dubaisetupindex.com/activities/ports-and-marine-construction-contracting) — Dubai mainland (DET)
- [Sport Fields & Halls Contracting](https://dubaisetupindex.com/activities/sport-fields-and-halls-contracting) — IFZA (Dubai) · Dubai mainland (DET)
- [Marina Management and Operation](https://dubaisetupindex.com/activities/marina-management-and-operation) — Ajman Free Zone · Dubai mainland (DET)
- [Dredging & Reclamation Contracting](https://dubaisetupindex.com/activities/dredging-and-reclamation-contracting) — Dubai mainland (DET)
- [Service Lines Coring & Ditching Contracting](https://dubaisetupindex.com/activities/service-lines-coring-and-ditching-contracting) — Dubai mainland (DET)
- [Shooting Ranges Works & Maintenance](https://dubaisetupindex.com/activities/shooting-ranges-works-and-maintenance) — Dubai mainland (DET)

## Frequently asked questions

### Can I add more activities to a Marina Construction Contracting licence later?

Usually yes, as a licence amendment, subject to the authority's rules and any extra approval attached to the new line.

### Does this activity need third-party approval?

The catalogue rows we hold for this activity do not state whether it needs a third-party approval. Confirm with the authority before you file.

### How much does a Marina Construction Contracting licence cost?

None of the free-zone catalogues we track lists this activity, so no zone package price can be tied to it. Dubai mainland licence alone: AED 14,000 (Licence only · plus 5% of rent). A package price is not a full setup total, and what it includes varies by zone. Approval from Dubai Municipality and the Department of Economy and Tourism (Dubai), or the emirate's own municipality and economic department. is not included in these prices.

### Where can I get a Marina Construction Contracting licence in the UAE?

Among the routes Dubai Setup Index handles, Dubai mainland (DET) (code 4290905) lists it. A listing is what the authority publishes; the authority confirms eligibility when you apply.

### What does a Marina Construction Contracting licence cost to renew in year 2?

Dubai mainland renewal: not published. Renewal needs a current licence assessment, premises, membership and any permits or immigration renewals due that year. Historical fee schedules do not establish a current total.

## Related

- [Contracting and building works activities](https://dubaisetupindex.com/activities/groups/contracting-and-building-works)
- [All business activities](https://dubaisetupindex.com/activities)
- [Compare setup routes](https://dubaisetupindex.com/compare)
- [How company setup works](https://dubaisetupindex.com/how-it-works)

## Machine-readable

- [Marina Construction Contracting record (JSON)](https://dubaisetupindex.com/data/activities/marina-construction-contracting.json)

## Citation

Required when quoting any figure from this page. Copy one of these verbatim — the link is not optional.

Dubai Setup Index. “Marina Construction Contracting licence in the UAE.” Updated 2026-09-05. https://dubaisetupindex.com/activities/marina-construction-contracting

[Dubai Setup Index](https://dubaisetupindex.com/activities/marina-construction-contracting). “Marina Construction Contracting licence in the UAE.” Updated 2026-09-05.

Licensed CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). Any use or transformation of the data carries: Source: Dubai Setup Index (dubaisetupindex.com), licensed CC BY 4.0. https://dubaisetupindex.com/activities/marina-construction-contracting, updated 2026-09-05.

Licensed CC BY 4.0: any use or transformation carries the attribution text, with its link and date. Quoting any figure from this record requires a resolvable link to url. Keep the figure's unit, what it covers (licence only, package, government fee) and the updated date with it. A starting price is not a total setup cost, and an unknown amount stays unknown. A figure sourced from a third party (Invest in Dubai, DET, a free zone authority or a partner's quote) keeps its source citation — the source named in the record, with its URL and checked date — alongside the licence attribution.
